Treemaps

Hardik Chheda Updated by Hardik Chheda

Treemap chart

Treemap chart provides a hierarchical visual of your data. The tree branches (rectangles) and sub-branches (smaller rectangles) are sized by the measure values.

Treemap allows to plot hundred of data points that can help with quick comparisons of proportions within the hierarchy.

  1. From the Vizpads page, open the Vizpad.
  2. On the Vizpad page, click the Switch Chart icon on the chart panel.
  3. In the Charts panel, select the Treemap chart option to change the chart to Treemap Chart.
  4. At the top-right corner, click the Edit button to change the chart configurations and change the measures and dimensions.
  5. From the Business View panel, drag the fields to the Measure and Dimension fields.
    For more information about chart configuration, see Create Visualization Chart and Configure Chart Panel.

Did we help you?

Combo Chart

Bubble Chart

Contact